Shut down. It is mandatory to procure user consent prior to running these cookies on your website. CONSTRUCTION RECORD DOCUMENTS The electrical contractor shall maintain a set of construction record documents during the construction period in accordance with Specification Division 01 Section Project Closeout. ELECTRICAL INSTALLATIONS General: Sequence, coordinate, and integrate the various elements of electrical systems, materials, and equipment. 4188 0 obj <> endobj Cut such items flush with masonry surfaces. ?\ 2j0D,xl>Kc2)b01UBu0% ## d X%XIL Economy and efficiency adjustments. 0 REPAIRS & RESTORATION OF SURFACES AND FINISHES: Restore all finishes, equipment and surfaces to original condition, where affected by the work. 3 0 obj Where pipe sleeves are installed in non-rated CMU walls fire rated sealant materials are not required. PDF Division 16 Section 16010 Electrical Basic Electrical Materials and Provide connectors with insulating bushings. service companies, and controlling agencies. 2. Remove and replace defective Work. Outages should be scheduled a minimum of ten (10) days in advance. Where coordination requirements conflict with individual system requirements, refer conflict to UMB. 590 0 obj <>stream Each and every punch list item shall be initialed and dated by the Contractor when the work is complete. Contractor shall furnish manufacturer's electrical equipment of the types and sizes specified which has successfully operated for not less than the past two years, except where specific types are named by manufacturer and catalog number or designation under other Sections of the Contract Documents. 6glqqS6&2S0gW %%EOF SECTON 16010 - GENERAL PROVISIONS 16010 - General Provisions.doc PART 1 GENERAL 1.01 Work Included .1 Provide all labour, materials, equipment, services and supervision required to provide a complete electrical system as listed herein and shown on the drawings. Only one submission per System Integrator will be allowed. Samples shall indicate applicable specification section number and item numbers within that section. Effective energy utilization. Examples of Sub Systems: Normal Power. 11275 0 obj <>/Filter/FlateDecode/ID[<1BCD9CA6C4893D4A874390606B4A9A2F>]/Index[11261 22]/Info 11260 0 R/Length 76/Prev 791633/Root 11262 0 R/Size 11283/Type/XRef/W[1 2 1]>>stream PDF SECTION 16010 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 Description A. 1. This section is a Division-16 basic Electrical Materials and Methods section, and is part of each Division-16 section making reference to electrical raceways . WORK PERFORMANCE All electrical work must comply with the requirements of NFPA 70 (NEC), NFPA 70B, NFPA 70E, OSHA Part 1910 subpart J, OSHA Part 1910 subpart S and OSHA Part 1910 subpart K in addition to other references required by the contract. This includes but is not limited to updating Equipment and/or Material Model Numbers indicated in the specifications and adding any additional specifications that may be required by the project. %%EOF hVKk@+{la b64j[`KARh3Vd$U!XLa 'f:dM%wwc@%nyS^7-ZygHmnH"*pEK&xD,wb76I]VGm)Z_j@vUMmuyhxy S[{_T ,((n&+~z?h~YrM`%Rb$I"s?)s #: +}[6 #F7fWnV={RvRz&QQ A`5~o4lo SI*XU'wSB$5)|9D xb 1mfaqs7&YDE/q$"B" Afp|ISKCyd: C#S `IzLCoqw^`rSG7*V VF7A,.V4P l#o{# in9E^mj`PcuVd5 Prepare reflected ceiling plans to coordinate and integrate installations, air outlets and inlets, light fixtures, communication systems components, cable trays, sprinklers, access doors and other ceiling mounted items. Pa>hRjf4L4)@5C'2O4)@5C'^T3}2-IT3}2-Iid>qd|'2.@5C'2& 1? mL|k; mL|%3 mL|E=j2UT362tFMf0j2fXQf62tM4)@5Ch3,IgDT362tZO4)@5Cj3,IDTme>iC5jfXqd>i?j2m4|z7j2Ou|GVvx6p+j6*|orw~~qyri{7g2a AoO{z'ZwoFOP1p(Cs&.8dnvr{x8^|\hyuba4w/Axu (p8g\n4d,K%T?Hd2nZirM0%H K y}?3S}~I4H>_yUuSxIZ C7F"T!5b~Q0; Omission of words or phrases such as "the Contractor shall", "as shown on Using the UMB Standard O&M Manual Template referenced in Division 01 Closeout Procedures insert the submittal files include both a bookmark and tree structure for accessing each submittal file in the manual. Place grout around anchors. For equipment rough-in requirements see specifications for electrical equipment. 16 ELECTRICAL GENERAL REQUIREMENTS Section 16010 Room numbers. 0 New Construction: All new penetrations shall be provided with a pipe sleeve and sealant materials. afdb`dg4baTfX:r-X5)H! Where access is by means of lift out ceiling tiles or panels mark access each panel using small color coded or numbered tabs. An electrical foreman, superintendent or other supervisor familiar with the project shall be in attendance for all scheduled electrical inspections. endstream endobj startxref o %PDF-1.5 % Servicing. Install systems, materials, and equipment level and plumb, parallel and perpendicular to other building systems and components, where installed exposed in finished spaces. Samples shall indicate applicable specification 0000001182 00000 n PDF SECTION 16110 RACEWAYS AND BOXES PART 1 - GENERAL - DeLapp 0000000596 00000 n PART 3 EXECUTION ROUGHIN Verify final locations for rough-ins with field measurements and with the requirements of the actual equipment to be connected. DTW Works Master Specification Section 16061 - Studylib Necessary cookies are absolutely essential for the website to function properly. CONCRETE HOUSEKEEPING PADS Provide concrete required for housekeeping pads under Division 23 unless otherwise noted. Adjustment. PART 1 GENERAL RELATED DOCUMENTS Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this section and all other Electrical Specification Sections. 8 d X 6 D Z Z Z Z r" T " " $ D " 2" 2" @ " " Z Z 6% 6% 6% " F Z Z 6% " 6% 6% " l C Z F4 8# 3 v ( 0 X # C C P 0 " " 6% " " " " " $ " " " X " " " " " " " " " " " " " X f : SECTION 260000 BASIC ELECTRICAL REQUIREMENTS Latest Update 03-10-2022. hb```b``va`2~12 3+P!tw0dgCDu/8d.bdhp!M\FuN(#]y.cC756plr3':,u B\ Local or State license where required. If any items have been initialed as being completed by the Contractor and the Architect/Engineer determines that the work is not complete, the Architect/Engineer shall be reimbursed by the Contractor at his regular hourly rate for any and all items requiring revisiting of the site by the Architect/Engineer. Clearances for servicing and maintaining electrical equipment. to a point below the finished floors or behind finished walls and cap. UMB Energized Work Permit: A UMB Energized Work Permit is required for any work on energized circuits or equipment. DEMONSTRATION AND INSTRUCTIONS Demonstrate operation and maintenance of equipment and systems to Owners personnel a minimum two (2) weeks prior to date of final inspection. Cutting and patching. CONCRETE HOUSEKEEPING PADS COORDINATE CONCRETE WORK WITH DIVISION 3. &F >`>a$gd$ ^ gd;F $ GROUT Grout shall be non-shrink, high strength type, free of iron or chlorides and suitable for use in contact with all metals, without caps or other protective finishes complying with ASTMC1107, GradeB and the following: Characteristics: Post hardening, volume adjusting, dry, hydraulic cement grout, nonstaining, noncorrosive, nongaseous, and recommended for interior and exterior applications. Floor Pipe Sleeves Applications: Pipe sleeves are required for all new conduit risers passing through floor slabs. B. In addition to the above statement the Guarantee/Warranty Period shall include all labor cost related to all warranty work. %PDF-1.6 % Properly store and handle all materials and equipment. (Engineer shall edit specifications and blue text in header to meet project requirements. All work in Divisions 26, 27, and 28 shall comply with the latest version of following codes and regulations as adopted by the State of Maryland and the State Fire Marshal, unless otherwise specified. Provide forms for placement of grout, as required. Arrange for each installer of equipment that requires regular maintenance to meet with the Owner's personnel to provide instruction in proper operation and maintenance. endstream endobj 879 0 obj <. Before shipment, the power distribution panel boards, shall be tested to ensure proper operation and conformance with manufacturer's published specifications. 1835 0 obj <>/Filter/FlateDecode/ID[<436FD37774A5B745BAA68B131E232EA6>]/Index[1820 93]/Info 1819 0 R/Length 81/Prev 195435/Root 1821 0 R/Size 1913/Type/XRef/W[1 2 1]>>stream Follow supported equipment manufacturer's setting templates for anchor bolt and tie locations. 264 15 Trouble shooting. shall meet the requirements of the associated spec section(s). SECTION 16010 BASIC ELECTRICAL REQUIREMENTS . They accommodate radial and axial loads in both directions, are easy to mount, and require less maintenance than many other bearing types. ANSI (American National Standards Inst.). 16010 - 1 . Emergency Power. %%EOF Distribution panels. Disconnect installed work as specified for testing. All existing unsealed penetrations for services passing through existing rated assemblies within the project area shall be provided with sealant materials. M0*``mvle}vw$ms3s%)[Fpk, V7#`,kzp:dM b([0.@Sk8@KGq4EY2:":@DD L'czU4,f53( iX 89 Coordinate connection of electrical services. Diagrams shall indicate cable on raceway between points. Place grout to completely fill equipment bases. GUARANTEE/WARRANTY: All materials, equipment, etc. Indicate locations where space is limited for installation and access and where sequencing and coordination of installations are of importance to the efficient flow of the Work, including (but not necessarily limited to) the following: Indicate the proposed locations of electrical equipment, and materials. SECTION 16010 - GENERAL PROVISIONS. product data and shall indicate applicable specification section and item numbers. Ends shall be capped with push plugs for future use. All adjustments and modifications shall be provided by the bidder and appropriate subcontractors at no additional cost to the project. Job site and worker safety are the responsibility of the contractor. General Provisions | PDF | Specification (Technical Standard) - Scribd Both riser and floor plan shall indicate address of devices where applicable. 0000002433 00000 n endstream endobj 2010 0 obj <>stream VARIANCES Where variances occur between the drawings and specifications or within either document itself, the item or arrangement of better quality, greater quantity or higher cost shall be included in the contract price. 571 0 obj <> endobj 2013 0 obj <>/Filter/FlateDecode/ID[<7A92318D9A66904D9BE2AA2059D48142><9E5BD34DD47A4B4CACDF0D2F3CF07D4E>]/Index[2006 15]/Info 2005 0 R/Length 55/Prev 136060/Root 2007 0 R/Size 2021/Type/XRef/W[1 2 1]>>stream SECTION 16010 -- GENERAL PROVISIONS DEFINITIONS Accepted/Approved: Shall mean accepted by the Project Representative.